Certificates & compliance

Certificates and compliance

supported by documented engineering practice.

X-YES provides ISO 9001 certification, CE-related documentation and technical records to support industrial vertical conveyor projects worldwide.

ISO 9001 scope

5 CE-listed models

9 utility models

Quality management system

Machine & EMC references

05

About X-YES

Read the evidence correctly

Certificates must match the delivered machine.

The customer needs more than a badge. They need to know which legal entity, product family, directives, standards, dates and supporting technical file the document refers to.

The materials below come from the X-YES company archive. Current validity and applicability must be verified before public download or customer submission.

Certificate interpreter

Three evidence types answer three different questions.

They support supplier due diligence only when the buyer reads the scope, date, holder and project relevance—not just the logo.

ISO 9001:2015

Does the organization run an audited quality system?

It supports

Process control, documented responsibilities, internal review and corrective-action discipline within the certified scope.

It does not prove

That a specific lift meets its design load, throughput, safety or destination requirements.

Buyer action: verify holder, certified scope, dates and issuing body.

CE conformity material

Which machine and EMC requirements were referenced for the listed product scope?

It supports

Review of machinery risk assessment, electrical design and electromagnetic-compatibility expectations for the listed product and models.

It does not prove

Blanket coverage for every customization, integrated production line or destination condition.

Buyer action: match the delivered configuration, declaration and technical file.

Utility-model patents

Where has the company documented mechanism-level development work?

It supports

Evidence of technical work around transfer, protection, sensing, structure and lifting mechanisms.

It does not prove

Product conformity, current legal status or complete-machine performance.

Buyer action: use patents as engineering context, not acceptance evidence.

Do not publish the sample as a final customer certificate.

The current English ISO archive image visibly carries a “sample” watermark. Replace it with the approved final copy, then recheck holder, certified scope, dates, issuing body and destination relevance before the live website or a tender submission uses it.

ISO 9001 archive material

What the current management-system document says.

ISO 9001 is about how the organization manages and improves its processes. Product-level verification remains a separate project responsibility.

Certificate holder

Xinlilong Intelligent Equipment (Suzhou) Co., Ltd.

Standard

GB/T 19001-2016 / ISO 9001:2015

Registration number

12426Q00346R001

Certified activity shown

Whole process of production of material elevators, excluding activities requiring qualification permits

Issue / validity shown

11 May 2026 / 10 May 2029

IAF / CNAS marks

Accreditation-framework marks associated with the certification body—not separate X-YES product approvals

CE document in the archive

What the current document actually states.

This summary reproduces the readable scope fields from the supplied CE material; it does not expand that scope to every future configuration.

Certificate number

M.2023.206.C86145

Registration / expiry

05 Jun 2023 / 04 Jun 2028

Product

Vertical Conveyor Lift

Models / types listed

CVC, RBCL, SCL, FPL, RL

Directives referenced

2006/42/EC · 2014/30/EU

Standards listed

EN ISO 12100:2010 · EN 60204-1:2018 · EN IEC 61000-6-2:2019 · EN IEC 61000-6-4:2019

Report reference

TCF-SITE20230531MR01

Holder name shown

Suzhou Intelligent Transportation Equipment Co., LTD

Issuer

UDEM International Certification

Important: The 2023 document shows a legal-entity name that differs from the current ISO certificate holder. Confirm the correct entity, final configuration, declaration, risk assessment, technical file, instructions and destination requirements for every order.

Utility model portfolio

Engineering for transfer, protection and machine safety.

The archive contains nine utility-model entries. The descriptions below explain the buyer-relevant engineering intent; they are not legal interpretations of claim scope. Patent status should be rechecked before publication.

Reference

Utility model

Buyer-relevant engineering intent

ZL 2023 2 2104640.4

Vertical conveyor buffer assembly

Manage impact and load behavior at a transfer handover.

ZL 2023 2 2104641.9

Stall protection mechanism

Detect and respond when expected motion is lost.

ZL 2023 2 2104635.3

Conveyor overload detection mechanism

Monitor abnormal loading and support a protective response.

ZL 2023 2 2104637.2

Pallet vertical conveying mechanism

Support and transfer palletized loads through a vertical route.

ZL 2024 2 2560560.4

Lift support template

Support assembly positioning, alignment or structural consistency.

ZL 2024 2 2731815.9

Nylon wheel

Address a guided-motion or wear-component detail.

ZL 2024 2 3021192.2

Logistics elevator

Organize a lift architecture for logistics transfer.

ZL 2024 2 0714170.5

Telescopic conveyor

Adjust transfer reach where the interface position changes.

ZL 2024 2 0714225.2

Pallet elevator

Provide a lifting architecture developed around pallet movement.

Buffer assembly

Stall protection

Pallet transfer

Project compliance path

Compliance starts from engineering definition.

Each project begins with confirming:

  • Product configuration
  • Operating environment
  • Safety requirements
  • Documentation requirements

01

Destination & use

Confirm country or region, intended use, operating environment and customer specifications.

02

Final configuration

Freeze product type, load, guarding, access, controls, interfaces and supplied scope.

03

Applicable requirements

Identify directives, standards, local rules, site requirements and required document language.

04

Verification plan

Align design review, inspection, test, risk and technical-file activities with the final machine.

05

Handover package

Prepare the agreed declarations, manuals, drawings, records and supporting documents.

Responsibility must be explicit.

The machine manufacturer, line integrator, installer and site owner may each retain different responsibilities. The contract should define machine-level conformity, line integration, civil work, utilities, guarding interfaces, controls, site validation and final acceptance.

Compliance FAQ

Questions a document center should answer.

No. The supplied document lists specific product types and references. The final machine configuration, legal entity, declaration, technical file and destination requirements must be checked for each order.

Applicable product families:

  • Continuous Vertical Conveyor (CVC)
  • Reciprocating Vertical Conveyor (RVC)
  • Single Column Lift (SCL)
  • Fork Platform Lift (FPL)
  • Roller Lift (RL)

ISO 9001 relates to the organization’s quality management system within the certified scope. It is not a substitute for product-specific design verification, testing or conformity work.

They can be made available after publication approval and validity review. Sensitive or project-specific files may be supplied directly rather than published openly.

Patents document claimed technical solutions; they do not replace application engineering, product testing or project acceptance. They are best used as supporting evidence of development work.

Depending on contract and destination: technical specifications, drawings, operating instructions, electrical information, inspection/FAT records, declarations and other project-specific documents. The list should be agreed before design freeze.

The parties should agree this responsibility contractually. The buyer and local integrator usually provide destination and site requirements, while X-YES confirms how the supplied machine scope will address the agreed requirements.

Continue exploring X-YES

Our History

Start with the application

Tell us what has to move—and where.

Share the load, throughput, travel height and available layout. Our engineering team will use the information to discuss a practical vertical transfer route.

PROJECT INQUIRY

Tell us what needs to move.

We will reply to your email within 24 hours.